home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / pc / text / spacedig / v16_6 / v16no629.txt < prev    next >
Internet Message Format  |  1993-07-13  |  34KB

  1. Date: Wed, 26 May 93 05:16:43    
  2. From: Space Digest maintainer <digests@isu.isunet.edu>
  3. Reply-To: Space-request@isu.isunet.edu
  4. Subject: Space Digest V16 #629
  5. To: Space Digest Readers
  6. Precedence: bulk
  7.  
  8.  
  9. Space Digest                Wed, 26 May 93       Volume 16 : Issue 629
  10.  
  11. Today's Topics:
  12. Comet Shoemaker-Levy, Possible Collision With Jupiter in 1994 (3 msgs)
  13.                   Detecting planets in other system
  14.                    Impediments to NASA productivity
  15.                    Launch Vehicle Permits (2 msgs)
  16.                    Looking for rocketry software...
  17.                     Magellan Update #2 - 05/25/93
  18.            Magellan Update - 05/25/93 (Aerobraking Started)
  19.                    Moon vs. asteroids, Mars, comets
  20.              Question about B&W markings on US launchers
  21.                          Restructure schedule
  22.                                SSF news
  23.        Tom Wolfe's THE RIGHT STUFF - Truth or Fiction? (2 msgs)
  24.  
  25.     Welcome to the Space Digest!!  Please send your messages to
  26.     "space@isu.isunet.edu", and (un)subscription requests of the form
  27.     "Subscribe Space <your name>" to one of these addresses: listserv@uga
  28.     (BITNET), rice::boyle (SPAN/NSInet), utadnx::utspan::rice::boyle
  29.     (THENET), or space-REQUEST@isu.isunet.edu (Internet).
  30. ----------------------------------------------------------------------
  31.  
  32. Date: 25 May 1993 22:26 UT
  33. From: Ron Baalke <baalke@kelvin.jpl.nasa.gov>
  34. Subject: Comet Shoemaker-Levy, Possible Collision With Jupiter in 1994
  35. Newsgroups: sci.space,sci.astro,alt.sci.planetary
  36.  
  37.                            COMET SHOEMAKER-LEVY (1993e)
  38.  
  39.      According to IAU Circular 5800, about 200 positions of Comet
  40. Shoemaker-Levy (1993e) have been reported so far with about 50 of them
  41. coming during the past month.  Most of the observations were of the "center"
  42. of the nuclear train [last I heard the comet split up into at least 21 pieces].
  43. The current computations indicate that the comet made a close flyby
  44. of Jupiter at only 0.0008 AU on July 8, 1992 (this is within Jupiter's
  45. Roche limit), and will make an even closer flyby of Jupiter on July 25, 1994.
  46.  
  47.      IAU Circular 5801 further discusses the orbital trajectory of the comet,
  48. and indicates that it is possible that half of the pieces of the comet may
  49. collide with Jupiter over a three day peroid in July 1994.  The surviving
  50. pieces may remain as satellites to Jupiter or be thrown closer to the sun on
  51. short-period heliocentric orbits.
  52.      ___    _____     ___
  53.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  54.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  55.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Never laugh at anyone's
  56. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | dreams.
  57. |_____|/  |_|/       |_____|/                     | 
  58.  
  59. ------------------------------
  60.  
  61. Date: Tue, 25 May 1993 23:06:12 GMT
  62. From: "Phil G. Fraering" <pgf@srl01.cacs.usl.edu>
  63. Subject: Comet Shoemaker-Levy, Possible Collision With Jupiter in 1994
  64. Newsgroups: sci.space
  65.  
  66. baalke@kelvin.Jpl.Nasa.Gov (Ron Baalke) writes:
  67.  
  68. >     IAU Circular 5801 further discusses the orbital trajectory of the comet,
  69. >and indicates that it is possible that half of the pieces of the comet may
  70. >collide with Jupiter over a three day peroid in July 1994.  The surviving
  71. >pieces may remain as satellites to Jupiter or be thrown closer to the sun on
  72. >short-period heliocentric orbits.
  73.  
  74. When does Galileo enter Jovian orbit again?
  75.  
  76. Not for a while, right?
  77.  
  78. *Wah...waaaahhhh..*
  79.  
  80. Seriously, this is why we need quick-reaction probes.
  81.  
  82. Also shows why Michael Adams "monitoring stations" are
  83. a good idea.
  84.  
  85. Finally: where *do* I get those forms for Hubble Telescope
  86. Time?
  87.  
  88. Is there a place I can write off for them?
  89.  
  90. >    /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  91. >    | | | |  __ \ /| | | |     Jet Propulsion Lab |
  92. > ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Never laugh at anyone's
  93. >/___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | dreams.
  94. >|_____|/  |_|/       |_____|/                     | 
  95.  
  96. --
  97.  
  98. +-----------------------+---------------------------------------+
  99. |Phil Fraering          | "...drag them, kicking and screaming, |
  100. |pgf@srl03.cacs.usl.edu | into the Century of the Fruitbat."    |
  101. +-----------------------+-Terry Pratchett, _Reaper Man_---------+
  102.  
  103. ------------------------------
  104.  
  105. Date: 25 May 93 18:02:17
  106. From: Steinn Sigurdsson <steinly@topaz.ucsc.edu>
  107. Subject: Comet Shoemaker-Levy, Possible Collision With Jupiter in 1994
  108. Newsgroups: sci.space
  109.  
  110. In article <pgf.738371172@srl01.cacs.usl.edu> pgf@srl01.cacs.usl.edu (Phil G. Fraering) writes:
  111.  
  112.  
  113.    Finally: where *do* I get those forms for Hubble Telescope
  114.    Time?
  115.  
  116.    Is there a place I can write off for them?
  117.  
  118.  "ftp stsci.edu" "get how_to_submit"
  119.  
  120.  Proposal deadline for cycle 4 was May 14 1993.
  121.  
  122.  Qualified personnel can get NASA AOs and RAs
  123. from "Ms Mary Ann Gaskins
  124.     Mail Code SPS
  125.     NASA HQ
  126.     Washington DC 20546-0001"
  127.  
  128. Please don't write off for a form unless you think
  129. you might seriously enter a serious proposal to NASA.
  130.  
  131.  If there's anything to be seen from HST for P/S-L then
  132. chances are it has been claimed - I think you can also
  133. review accepted proposals and time-lines electronically,
  134. see README file at ftp site above. If not, Directors 
  135. Disgressionary time is only chance at this stage,
  136. amateurs qualify for that.
  137.  
  138. |  Steinn Sigurdsson    |I saw two shooting stars last night        |
  139. |  Lick Observatory    |I wished on them but they were only satellites    |
  140. | steinly@lick.ucsc.edu |Is it wrong to wish on space hardware?        |
  141. | "standard disclaimer"    |I wish, I wish, I wish you'd care - B.B. 1983    |
  142.  
  143. ------------------------------
  144.  
  145. Date: Tue, 25 May 1993 22:30:50 GMT
  146. From: dempsey@stsci.edu
  147. Subject: Detecting planets in other system
  148. Newsgroups: sci.space
  149.  
  150. In article <1993May21.143420.14225@vax.oxford.ac.uk>, clements@vax.oxford.ac.uk writes:
  151.  
  152. > In article <1993May19.180739.23064@sierra.com>, lbrader@sierra.com (Larry Brader - contractor) writes:
  153. >> What type of technology is required to detect planets in other
  154. >> solar systems? I'm thinking earth size, within 30 light years.
  155. >> 
  156. > For Earthlike planets you'll need something along the lines of a 16m telescope
  157. > of the moon. Jovian planets are rather easier and advanced Adaptive Optics
  158. > systems on 4 or 8 metre class ground based telescopes may manage to detect
  159. > them. For a full assessment you could do worse than refering to the AIP
  160. > conference proceedings 'Astrophysics from the Moon'.
  161. >
  162.  
  163. Maybe if you want to do it from the ground...
  164.  
  165. There is currently a project at Ames working on this using a spaced based
  166. photometer.  The idea is that they will look for millimagnitude variations
  167.  
  168. over time for 10's of thousands of stars.  They are concentrating
  169. on late-type cool stars and they have already modeled the anticipated
  170. results and it is doable.  They hope to detect jupiter size dark objects
  171. around G-K stars.  If the funding goes well the hope to be up by
  172. the end of the decade.
  173.  
  174.  
  175. ----------------------------------------------------------------------------
  176. Robert Dempsey                                  (410) 338-1334
  177. STScI/PODPS                                                                
  178.  
  179. I quote others only to better express myself.  - Michel de Montaigne
  180. ----------------------------------------------------------------------------
  181.  
  182. ------------------------------
  183.  
  184. Date: Tue, 25 May 1993 21:40:04 GMT
  185. From: kjenks@gothamcity.jsc.nasa.gov
  186. Subject: Impediments to NASA productivity
  187. Newsgroups: sci.space,talk.politics.space
  188.  
  189. In my diatribe about NASA productivity, I wrote:
  190. : >Most of the inefficiencies I have observed at NASA are
  191. : >the result of management decisions...
  192.  
  193. Jim Hart (jhart@agora.rain.com) wrote:
  194. : Let me guess: Ken is not a manager. :-)  
  195.  
  196. Actually, I am.  Or I was.  I started my new job yesterday -- as an
  197. engineer again.  (Hurrah!)  That diatribe was kind of a farewell
  198. address to my previous organization.  I doubt that it will do any
  199. good, but my (former) boss asked for my input.
  200.  
  201. I wrote:
  202. : >When we desire to decrease an office's (or a Program's)
  203. : >budget, we never manage to fund the changes which can increase
  204. : >efficiency; we just cut the budget.  
  205.  
  206. Jim replied:
  207. : But the whole point in increasing efficiency is to decrease
  208. : the ratio of $/(something valuable).  If those changes do
  209. : not *in fact* increase efficiency, you've just *decreased*
  210. : efficiency by funding them.  Naming something an "efficiency
  211. : proposal" doesn't make it so; how do you know until you've
  212. : tried it?
  213.  
  214. Yes, but my point is that you sometimes have to invest money to
  215. make productivity improvements.  Then (and this is the part where
  216. we at NASA fall down) we have to go back and check to see that
  217. we actually did get the productivity improvement we thought we'd
  218. get.  Do any other organizations have a good track record here?
  219.  
  220. Me:
  221. : >examine our JSC Employee Suggestion Program, where less than
  222. : >10% of the suggestions are implemented.
  223.  
  224. Jim:
  225. : IF you had spent c. 10 times as much money, so you
  226. : could implement 100% of these changes, then we would have ended up
  227. : spending less money? Or might the problem lie instead in *which*
  228. : 10% were chosen?
  229.  
  230. Some of those suggestions are certainly frivolous.  But when I called
  231. the JSC Employee Suggestion Office to get that data (10% of suggestions
  232. are accepted), they hadn't even heard of this effort at describing
  233. impediments to NASA productivity.  Since productivity is their product,
  234. so to speak, it seems reasonable that they be in the loop.  Their
  235. non-involvement is yet another example of the lack of communication
  236. which can happen in a large organization.
  237.  
  238. : >As W. Edwards Deming says with regard to
  239. : >quality, "if you can't measure it, you can't manage it." 
  240.  
  241. : I'll agree with you here.  Unfortuneately, Deming was talking about
  242. : repetitive manufacturing work, not R&D.   Unless we're talking about
  243. : things like computer performance, most R&D benchmarks in the private
  244. : sector are abstract: for example, how much will it sell at what
  245. : price.  It would be interesting to see NASA set up some internal
  246. : market-like incentives, but that would entail a huge (and beneficial)
  247. : cultural change.
  248.  
  249. We had a debated about this in sci.engr last year.  What quality
  250. metrics can reasonably be determined for an R&D organization?  It's
  251. not an easy problem.  Fortunately, Goldin has a tiger team working
  252. on just that problem.  (He's a good egg.)
  253.  
  254. Me:
  255. : > Each productivity metric could be given a value
  256. : >in dollars which gives a measure of its value to the country.  
  257.  
  258. Jim:
  259. : Aah, there's the rub.  How does one measure "value to the
  260. : country?"  By how NASA projects fare in political opinion
  261. : polls?  
  262.  
  263. If we are doing something of value to the country (like developing
  264. new technology to be used in future civilian aerospace applications),
  265. we should be able to estimate that value in dollars.  How else can
  266. we know if we're doing a good job?  But we already know about NASA
  267. estimates....
  268.  
  269. Me:
  270. : >suggestions will increase efficincy 257%, guaranteed.  
  271.  
  272. Jim:
  273. : You were doing pretty good up until here.  "Guarunteed"?  Does
  274. : this mean you will personally pay for any shortfalls?  You see,
  275. : out here in the private sector "guaruntee" is an actual promise,
  276. : eg that you will get your money back; it is not just rhetoric to
  277. : be thrown around in a policy paper.
  278.  
  279. You missed the joke, Jim.  257% of what?  How can anybody prove
  280. me wrong?  I fulfill that guarantee easilly.
  281.  
  282. Me:
  283. : >3.  Payroll
  284.  
  285. Jim:
  286. : Does any employee think they're paid *too much*?  :-)  One thing
  287. : to keep in mind is that the cost of living at many NASA sites
  288. : (Houston, Ohio, Alabama, etc.) is often 20% lower than in Silicon
  289. : Valley and other high-tech  spots when comparing these salaries.   
  290. : Somehow I don't think NASA will magically improve just by giving y'all
  291. : a raise, but nice try anyway. :-)
  292.  
  293. Agreed, a pay raise wouldn't solve all of NASA's problems, but it would
  294. help attract really talented people.  But I don't want to work with the
  295. kind of people who are ONLY here for the paycheck.
  296.  
  297. Me:
  298. : >    We should propose a list of Agency goals to Congress and the
  299. : >    President, and request their help in ensuring that these goals
  300. : >    match what our ultimate customers, the American people, want out of
  301. : >    NASA.
  302.  
  303. Jim:
  304. : But this is no longer funny.  Sir, customers
  305. : are people who can *choose for themselves* what they want to buy.
  306. : I do not get to choose how much taxes I have to pay,
  307. : or how much of it should go towards your "investements".  Since
  308. : NASA has no real customers, it does not lose revenue when it f*cks up, 
  309. : or gain revenue when it succeeds, as can be clearly shown by looking 
  310. : at NASA's budget during Apollo and directly after Challenger.  Please 
  311. : keep the Orwellian theft of the language of private enterprise confined
  312. : to the jokers in the White House, for God's sake.
  313.  
  314. Since we're talking about productivity, I was using the TQM term for
  315. "customer" -- whether they pay for the product or not.  Since you are
  316. outraged, I can assume that you are not a happy customer.  That's
  317. understandable.  But it doesn't mean that you are not a customer.
  318. Every one of us reaps the benefits of NASA technology, whether we
  319. appreciate it (or pay for it) or not.
  320.  
  321. The key concept in TQM's "customers" and "products" is accountability.
  322. The producers must understand both the products and the consumers.
  323. Otherwise, the producers cannot become accountable for the results.
  324.  
  325. Me:
  326. : >    We need the whole-hearted
  327. : >    cooperation of Congress, and more discipline than Congress has ever
  328. : >    been willing to demonstrate. 
  329.  
  330. Jim:
  331. : Don't forget about the Tooth Fairy and Santa Claus, they can help out
  332. : too. 
  333.  
  334. Since my inputs were supposedly to be presented to Al Gore (after being
  335. filtered by NASA management, of course), I thought I'd ask for the
  336. cooperation of Congress.  We won't get it, of course, but at least we
  337. should ask.
  338.  
  339. -- Ken Jenks, NASA/JSC/GM2, Space Shuttle Program Office
  340.       kjenks@gothamcity.jsc.nasa.gov  (713) 483-4368
  341.  
  342.      "Better.  Faster.  Cheaper." -- Daniel S. Goldin, NASA Administrator
  343.  
  344. ------------------------------
  345.  
  346. Date: 25 May 1993 23:06:24 GMT
  347. From: Matthew R Feulner <marf@athena.mit.edu>
  348. Subject: Launch Vehicle Permits
  349. Newsgroups: sci.space
  350.  
  351. We're working here on a student project, called project Olympus, to launch a
  352. hybrid rocket to put a very small payload into orbit.  Up to now, it's
  353. mainly been a project to design a hybrid motor, but now we're actually
  354. looking at regulatory type stuff.  We need to know what permission we need
  355. to (1) launch this vehicle (probably from some NASA sight), (2) transmit
  356. data from orbit to ground, (3) get an orbit slot?  Questions like "What happens
  357. when it reenters, if we launch into a real low orbit" need to be answered.
  358. Other issues?
  359.  
  360. This probably won't occur for years and years, but we may launch an upper
  361. stage as a sounding rocket tester within a couple of years.
  362.  
  363. We're also having problems coming up with a way to destruct it (in the event
  364. of a failure) since it's not explosive.
  365.  
  366. Any answers or thoughts or leads?
  367.  
  368. Thanks,
  369. Matthew Feulner
  370. matthew_feulner@qmlink.draper.com
  371.  
  372. ------------------------------
  373.  
  374. Date: Tue, 25 May 1993 23:46:26 GMT
  375. From: Henry Spencer <henry@zoo.toronto.edu>
  376. Subject: Launch Vehicle Permits
  377. Newsgroups: sci.space
  378.  
  379. In article <1tu8pgINNpok@senator-bedfellow.MIT.EDU> marf@athena.mit.edu (Matthew R Feulner) writes:
  380. >... at regulatory type stuff.  We need to know what permission we need
  381. >to (1) launch this vehicle (probably from some NASA sight), (2) transmit
  382. >data from orbit to ground, (3) get an orbit slot?
  383.  
  384. For launch, you need a permit from the Office of Commercial Space
  385. Transportation, which is part of the Dept. of Transport.  I'm told
  386. they can be reached at (202)366-2929, although I haven't tried myself.
  387. That covers essentially everything except radio transmitters.
  388.  
  389. For the transmitters, you need licences from the FCC.
  390.  
  391. There is no notion of "orbit slots" except in Clarke orbit, and just as
  392. well, because the less said about the bureaucracy involved for *that*,
  393. the better.
  394.  
  395. >Questions like "What happens
  396. >when it reenters, if we launch into a real low orbit" need to be answered.
  397.  
  398. I think you basically have to make OCST happy about this -- shouldn't be
  399. hard since nobody else does much about the matter -- and that's it.  The
  400. US government, not you personally, is responsible for any damage.
  401.  
  402. >This probably won't occur for years and years, but we may launch an upper
  403. >stage as a sounding rocket tester within a couple of years.
  404.  
  405. Anything that is capable of going above 100km needs an OCST permit.  Below
  406. that, I think they bow out and it's mostly the FAA that has to be kept happy.
  407. (The OCST minima are stated in more complex terms, but 100km is what they
  408. boil down to, I'm told.)
  409.  
  410. >We're also having problems coming up with a way to destruct it (in the event
  411. >of a failure) since it's not explosive.
  412.  
  413. The purpose of a destruct system is not to shred the rocket, it is to
  414. positively and reliably terminate all thrust.  (The former is frequently
  415. a consequence of the latter, but it's not itself a requirement.)  Nothing
  416. short of a nuclear weapon will break a rocket up so thoroughly that the
  417. pieces can't hurt anyone standing underneath the trajectory.  The destruct
  418. system is just there to make sure the rocket cannot run wild and hit
  419. something that is nowhere near the intended trajectory.  Anyway, for
  420. this, you need to talk to the range authorities of whatever launch site
  421. you are considering using.  Assuming you've got the usual sort of hybrid,
  422. solid fuel and liquid oxidizer, I would guess that blowing open the oxidizer
  423. tank would terminate thrust reliably enough.
  424. -- 
  425. SVR4 resembles a high-speed collision   | Henry Spencer @ U of Toronto Zoology
  426. between SVR3 and SunOS.    - Dick Dunn  |  henry@zoo.toronto.edu  utzoo!henry
  427.  
  428. ------------------------------
  429.  
  430. Date: Tue, 25 May 93 11:34:17 -0700
  431. From: Jim White <tosh!white>
  432. Subject: Looking for rocketry software...
  433. Newsgroups: sci.space
  434.  
  435. In <1993May25.043928.17712@ee.ubc.ca> davem@ee.ubc.ca (Dave Michelson) writes:
  436. >In article <C7Ju7w.KK7@mach1.wlu.ca> mpitche5@mach1.wlu.ca (mark pitcher 9208 U) writes:
  437. >>    A few years ago, I put together a simple program to help me
  438. >>determine what characteristics to expect from amateur rockets...
  439.  
  440. >>    I have since found even more detailed information on rocket flight
  441. >>characteristics, and am putting together an even more elaborate program.
  442.  
  443. >>    I am looking for other such computer programs that I can use as a
  444. >>guide, or to compare my results with.  If you know of such a program, please
  445. >>email me and tell me where I can find it.  Thanks.
  446.  
  447. >I hope that you're planning to make *your* software available to others :-)
  448. >Sounds interesting.
  449.  
  450. >--
  451. >Dave Michelson  --  davem@ee.ubc.ca  --  University of British Columbia
  452.  
  453. I would also be interested in your software.
  454.  
  455.  
  456. -- 
  457. Jim White
  458.  
  459. ------------------------------
  460.  
  461. Date: 25 May 1993 23:00 UT
  462. From: Ron Baalke <baalke@kelvin.jpl.nasa.gov>
  463. Subject: Magellan Update #2 - 05/25/93
  464. Newsgroups: sci.space,sci.astro,alt.sci.planetary
  465.  
  466. Forwarded from Doug Griffith, Magellan Project Manager
  467.  
  468.                        MAGELLAN STATUS REPORT
  469.                             May 25, 1993
  470.  
  471. 1.  The Magellan spacecraft started its Transition Experiment this
  472. morning at 10:31 AM PDT with an Orbit Trim Maneuver (OTM) which lowered
  473. its periapsis (closest approach to Venus) to 149.4 km.
  474.  
  475. 2.  Telemetry indicated that the 11.3 minute burn of the thrusters was
  476. normal, but the spacecraft engineers had to wait another two hours for
  477. the results of the first passage through the upper atmosphere.
  478.  
  479. 3.  Following the first atmospheric drag pass, all subsystems were
  480. reported to be nominal.  Temperatures are in the expected range and
  481. the attitude control system reports the expected number of gyro
  482. pulses.
  483.  
  484. 4.  The target altitude was selected so that the spacecraft would
  485. experience about 20% of the maximum allowable dynamic pressure, so the
  486. temperatures and torques on the spacecraft at this stage are minimal.
  487.  
  488. 5.  During the next four days a series of walk-in trim maneuvers will
  489. further lower the periapsis until the spacecraft is in the desired
  490. corridor.
  491.  
  492. 6.  This evening, following analysis by the Navigation Team of the
  493. first two orbits of aerobraking, the exact magnitude for the next OTM
  494. will be decided.  That corridor-adjustment OTM is scheduled for
  495. 5:46 AM PDT tomorrow.
  496.      ___    _____     ___
  497.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  498.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  499.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Never laugh at anyone's
  500. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | dreams.
  501. |_____|/  |_|/       |_____|/                     | 
  502.  
  503. ------------------------------
  504.  
  505. Date: 25 May 1993 21:43 UT
  506. From: Ron Baalke <baalke@kelvin.jpl.nasa.gov>
  507. Subject: Magellan Update - 05/25/93 (Aerobraking Started)
  508. Newsgroups: sci.space,sci.astro,alt.sci.planetary
  509.  
  510. Forwarded from:
  511. PUBLIC INFORMATION OFFICE
  512. JET PROPULSION LABORATORY
  513. CALIFORNIA INSTITUTE OF TECHNOLOGY
  514. NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
  515. PASADENA, CALIF. 91109. TELEPHONE (818) 354-5011
  516.  
  517.                      MAGELLAN STATUS REPORT
  518.                           May 25, 1993
  519.  
  520.      The Magellan spacecraft was lowered into the top of the
  521. Venus atmosphere today for an "aerobraking" maneuver, the first
  522. of its kind in planetary exploration, to begin the process of
  523. circularizing its highly elliptical orbit.
  524.  
  525.      The operation began at 10:31 a.m. Pacific Daylight Time with
  526. a thruster burn lasting until 10:41 a.m. to slightly slow the
  527. spacecraft.  The high-gain antenna was turned toward Earth at
  528. 10:54 a.m. and the spacecraft first struck the outer atmosphere
  529. at 12:00 noon.  The atmospheric contact on the first orbit lasted
  530. until 12:36 p.m.
  531.  
  532.      The operation, to continue over about 80 days, will slowly
  533. bring the spacecraft from its current orbit ranging between 170
  534. kilometers (105 miles) and 8,500 kilometers (5,300 miles) from
  535. Venus, to a new, more circularized orbit of 200 by 600 kilometers
  536. (125 by 375 miles).  The change will alter the time taken by each
  537. orbit from 3 hours, 15 minutes to about 90 minutes.
  538.  
  539.      If the maneuver is successful, the new orbit will permit
  540. high-resolution gravity studies at Venus's poles as well as at
  541. its equatorial latitudes.
  542.  
  543.      The second "drag pass," when the spacecraft will again dip
  544. into the atmosphere to continue the circularizing process, was
  545. scheduled for 3:14 p.m. to 3:50 p.m. PDT today.
  546.  
  547.                               #####
  548.      ___    _____     ___
  549.     /_ /|  /____/ \  /_ /|     Ron Baalke         | baalke@kelvin.jpl.nasa.gov
  550.     | | | |  __ \ /| | | |     Jet Propulsion Lab |
  551.  ___| | | | |__) |/  | | |__   M/S 525-3684 Telos | Never laugh at anyone's
  552. /___| | | |  ___/    | |/__ /| Pasadena, CA 91109 | dreams.
  553. |_____|/  |_|/       |_____|/                     | 
  554.  
  555. ------------------------------
  556.  
  557. Date: Wed, 26 May 1993 00:34:22 GMT
  558. From: "Richard A. Schumacher" <schumach@convex.com>
  559. Subject: Moon vs. asteroids, Mars, comets
  560. Newsgroups: sci.space
  561.  
  562. Perhaps an illustration would help: if there were an 
  563. asteroid of solid platinum in LEO right now, it would
  564. not pay (by a factor of 2 or so) to bring any of it back
  565. using the shuttle.
  566. (Assumptions: max shuttle landing payload weight = 20,000 lbs.
  567. Pt at $700 per oz. Shuttle flight costs >= US$350,000,000.)
  568.  
  569. ------------------------------
  570.  
  571. Date: 25 May 1993 23:07:41 GMT
  572. From: Brian Schar <schar@ssdgwy.mdc.com>
  573. Subject: Question about B&W markings on US launchers
  574. Newsgroups: sci.space
  575.  
  576. > In article <1993May25.104909.7653@yc.estec.esa.nl> mike@yc.estec.esa.nl (Mike Parsons) writes:
  577. > >Why do several US launchers (especially early ones like Redstone, Titan
  578. > >and Saturn) have strong black and white stripe markings? 
  579.  
  580.  
  581. In article <1993May25.182237.27894@lmpsbbs.comm.mot.com>,
  582. dennisn@ecs.comm.mot.com (Dennis Newkirk) wrote:
  583. > The last N-1 launched had its third stage painted white on roughly
  584. > one half of its side while the rest of the booster was gray or 
  585. > probably a dark metal finish. The shroud was white. Some of the other N-1's 
  586. > seem to have been all white, but this is only a very preliminary finding.
  587. > The Proton has a black stripe horizontally above the 1st stage engines, and
  588. > the inner tank is silver or gray while the outer tanks are white 
  589. > making them stand out well. The Soyuz type usually has very few large
  590. > markings (recent advertisments excepted), but the dark green paint 
  591. > contasts well with the frost that forms over the LOX tanks and can
  592. > easily be seen for some time after launch. The Zenit has large vertical
  593. > stripes on the payload shroud and a checker board pattern at the base
  594. > of the 2nd stage. The Tsyklon also has checker board and stripes, and the
  595. > Kosmos has several horizontal stripes and a checker board pattern.
  596. > Some fuzzy pictures of the SS-6 ICBM tests show probably a checkerboard 
  597. > pattern around the nose. Also many US V-2 tests had bold markings and I 
  598. > think German V-2 test flights also had bold markings sometimes.  
  599. > As far as I know most of these markings are just to aid visual tracking.
  600. > You probably can compare these markings to those used on flight test 
  601. > aircraft of F-14's, 15's, and 18's, some of which had bold color patterns.
  602.  
  603. I believe the black and white stripes were used as a passive thermal
  604. control scheme, as opposed to all black (absorb a lot of visible light) or
  605. all white (reflect a lot of visible light).  Stripes would give you a
  606. balance between the two no matter what the angle of the sun.  
  607. ________________________________________________________
  608. Brian Schar           | All facts in this post are in the public domain.
  609. All
  610. schar@ssdgwy.mdc.com  | opinions are my own.
  611.  
  612. Don't blame me - I voted Libertarian!
  613.  
  614. ------------------------------
  615.  
  616. Date: 25 May 1993 22:35:25 GMT
  617. From: Andy Cohen <Cohen@ssdgwy.mdc.com>
  618. Subject: Restructure schedule
  619. Newsgroups: sci.space
  620.  
  621. May 27: Final Space Station Redesign Team report due to printer
  622.  
  623. May 27:House VA-HUD-IA (including NASA) Subcommittee mark-up
  624. (Appropriation)
  625.  
  626. June 6: Multi-lateral Program Coordination Committee meeting
  627.  
  628. June 7: Final report to Redesign Advisory Committee (Blue Ribbon Panel)
  629.  
  630. June 8: House Authorization hearing on SS redesign
  631.  
  632. June 9: House Space Subcommittee mark-up (Authorization)
  633.  
  634. June 10: Senate VA-HUD-IA Subcommittee hearing on Space Station
  635. (Appropriation)
  636.  
  637. June 10: Senate Commerce Committee hearing on Space Station (Authorization)
  638.  
  639. June 10: Final Redesign Advisory Committee report to White House
  640.  
  641. June 11: International Partners Meeting #2 on Space Station
  642.  
  643. June 13:  President Clinton's decision on Redesign
  644.  
  645. June 14: House VA-HUD-IA Subcommittee hearing on SSF Redesign
  646.  
  647. June 22:  House Appropriations full Committee mark-up of VA-HUD-IA bill
  648.  
  649. June 25: House floor action on VA-HUD-IA Appropriation Bill (debate and
  650. vote)
  651.  
  652. ------------------------------
  653.  
  654. Date: 25 May 1993 22:34:14 GMT
  655. From: Andy Cohen <Cohen@ssdgwy.mdc.com>
  656. Subject: SSF news
  657. Newsgroups: sci.space
  658.  
  659. The first Preliminary Software Architecture Review is underway at MDA
  660. Houston, TX, with over 300 government and contractor representatives from
  661. across the Space Station program.  IBM, Houston, along with MDA are playing
  662. an integral role in the six-week review.  The review to date demonstrates
  663. clear understanding of technical issues, software build process and
  664. software architecture, establishing a firm foundation for continued
  665. development of Space Station data management system software.
  666.                                                 
  667. A U.S. Navy-sponsored Best Manufacturing Practices survey team recently
  668. designated MDA's Space Station design and manufacturing process as a "Best
  669. Practice" within industry.  During their visit, the team learned about
  670. MDA's concurrent engineering, three-dimensional, computer-aided design, and
  671. the most recent applications of computer aided manufacturing (CAD/CAM).
  672.  
  673. Because MDA used computer-aided technology throughout the concurrent
  674. engineering process, drawings on a Space Station flight experiment had the
  675. lowest change traffic of any project to date, and 99.4% first-time
  676. manufacturing quality.  Extensive use of CAD/CAM  technology reduces costs,
  677. shortens schedules, and results in first-time quality products.  
  678.                                                         
  679.  
  680. Canadian partners and MDA engineers recently tested a mockup of the remote
  681. manipulator system and the mobile transporter in NASA's weightless
  682. environment training facility, Houston.
  683.                                                        
  684. MDA recently accepted multiplexer-demultiplexer application software test
  685. equipment from Honeywell in Glendale, AZ.  The equipment will be used by
  686. all Space Station work packages (MDA, Boeing, Rocketdyne) to test
  687. application software each will produce.  This low-cost solution for testing
  688. MDM flight software is built from commercial hardware and software which
  689. can be tailored and upgraded as the needs of the program change.
  690.                                                      
  691. A 16-minute, narrated computer-animation video produced by MDA engineers
  692. depicts assembly techniques that will be used to construct Space Station
  693. Freedom.  The computer-generated images were created from actual
  694. engineering drawings.  The video shows station hardware components being
  695. transported into space inside the Space Shuttle cargo bay, and accurately
  696. represents how the station will be assembled--step by step-- in orbit. 
  697.                                                    
  698. Across the country -- 
  699.   IBM, Houston's  first delivery of the Space Station master object data
  700. base manager became operational earlier this month.  Avionics information
  701. and software are managed and stored in this system.  Data tables are built
  702. by the DMS system software using the MODBM, and contain large amounts of
  703. information, such as the station's weight, guidance, navigation, sensor,
  704. experiment, and payload data--vital to the operation of the Space Station. 
  705.  EG&G Wright Components, Phelps, NY, successfully completed 1 million
  706. cycles on a thruster valve section, with no leakage.  This is two times the
  707. specified requirement.
  708.  Astro, Carpenteria, CA, flight drawing release remains on schedule with
  709. 473 of 527 mobile transporter flight drawings released to date.  
  710.  Sundstrand Corp., Rockford, IL,  has completed checkout of the active
  711. thermal control system pump module test stand and will begin testing on May
  712. 24.  The module provides pumping, liquid-vapor separation, and control for
  713. the two-phase thermal control system.  The test stand will be used to test
  714. the pump module over its entire operating range including thermal loads up
  715. to 55 KW and radiator return ammonia temperatures down to -100 deg F. 
  716.  At the White Sands, New Mexico Test Facility, full-scale, flight-like
  717. propellant tanks have been installed in the development test unit and will
  718. undergo tests with other flight-like propulsion system components in June. 
  719. This is the 5th series of tests on the propulsion system.
  720.  
  721. ------------------------------
  722.  
  723. Date: 25 May 1993 21:47:56 GMT
  724. From: Claudio Oliveira Egalon <C.O.Egalon@larc.nasa.gov>
  725. Subject: Tom Wolfe's THE RIGHT STUFF - Truth or Fiction?
  726. Newsgroups: sci.space,sci.space.shuttle,rec.arts.books
  727.  
  728. I do not know what is true or fiction in Tom Wolfe's 
  729. book (which I enjoyed a lot to read) BUT I can point 
  730. out that I notice one difference in his book when I 
  731. checked another source. That is the one regarding 
  732. what happened between Guss Grisson and his wife, 
  733. Betty Grissom, after Grisson returned from his first 
  734. sub-orbital flight. According to Tom Wolfe, Betty 
  735. Grisson got real mad about the way they were treated 
  736. after Guss returned from his flight (apparently 
  737. because of the blown hatch) and, still according to 
  738. Tom Wolfe, she even threatened to cut her own 
  739. wrist if Guss did not take her to the Holiday Inn 
  740. where the real comemoration of Grisson's flight 
  741. was taking place. Also, Tom Wolfe mentioned 
  742. that Guss Grisson was surprised by the way  his 
  743. wife  was behaving,  he just couldn't recognize 
  744. her! OK, when I read the book Star Fall by Betty 
  745. Grisson, the astronaut's  widow, the account 
  746. was slightly different;
  747.  
  748. 1) she admited she really got mad about the way 
  749. they were treated (which confirms one of the 
  750. things that Tom Wolfe wrote) BUT
  751.  
  752. 2) she did not mentioned about threatening 
  753. Guss to cut her own wrist and
  754.  
  755. 3) according to Star Fall Guss Grisson just  
  756. understood the way his wife was feeling and 
  757. went along with her request without feeling 
  758. surprised.
  759.  
  760. Any comments??? 
  761.  
  762. C.O.Egalon@larc.nasa.gov
  763.  
  764. Claudio Oliveira Egalon
  765.  
  766. ------------------------------
  767.  
  768. Date: Tue, 25 May 1993 23:28:35 GMT
  769. From: Henry Spencer <henry@zoo.toronto.edu>
  770. Subject: Tom Wolfe's THE RIGHT STUFF - Truth or Fiction?
  771. Newsgroups: sci.space,sci.space.shuttle,rec.arts.books
  772.  
  773. In article <1993May25.202635.26408@nntpd.lkg.dec.com> klaes@verga.enet.dec.com (Larry Klaes) writes:
  774. >    ... wondering if there are some who could tell me what in Tom
  775. >    Wolfe's novel on the MERCURY astronauts, THE RIGHT STUFF, is
  776. >    accurate and what has been embellished upon for whatever reason.
  777.  
  778. I don't think anyone is going to do a page-by-page dissection. :-)  In
  779. general, the book may be useful background on what people thought, but
  780. it is not reliable history.
  781.  
  782. For example, Wolfe makes much of Grissom being blamed for the loss of
  783. his Mercury capsule, saying that his "the hatch just blew" explanation
  784. was never taken seriously.  While that *was* everyone's first reaction,
  785. Sam Beddingfield -- a NASA engineer on the investigating team -- insisted
  786. on pursuing the matter further, and the eventual conclusion was that
  787. there was not one but *two* ways in which that really could have happened.
  788. Even if you don't happen to know that, you might wonder how the disgraced
  789. Grissom came to be picked as commander of the first manned Gemini *and*
  790. the first manned Apollo.
  791.  
  792. The movie is even worse than the book.
  793. -- 
  794. SVR4 resembles a high-speed collision   | Henry Spencer @ U of Toronto Zoology
  795. between SVR3 and SunOS.    - Dick Dunn  |  henry@zoo.toronto.edu  utzoo!henry
  796.  
  797. ------------------------------
  798.  
  799. End of Space Digest Volume 16 : Issue 629
  800. ------------------------------
  801.